罗秉珠.岩滩溢流坝应用宽尾墩联合消能技术的机理、效果、效益与启迪[J].广西科学,1997,4(2):155-160. [点击复制]
- Luo Bingzhu.Mechamism,Effectiveness,Benefit and Enlightenment on the Combining by Application of Flaring Gate piers Combining Energy Dissipation on Yantan Spillway Dam[J].Guangxi Sciences,1997,4(2):155-160. [点击复制]
|
|
摘要: |
宽尾墩联合消能技术,是传统二元水流消能方式迈进三维空间消能简单而有效的工程措施。通过岩滩水电站具体应用,并经过工程运行实践表明,可以兼收工程、经济与社会三方面效益。 |
关键词: 水电站 戽式消力池 宽尾墩 联合消能效果 流态 |
DOI: |
投稿时间:1997-01-02 |
基金项目: |
|
Mechamism,Effectiveness,Benefit and Enlightenment on the Combining by Application of Flaring Gate piers Combining Energy Dissipation on Yantan Spillway Dam |
Luo Bingzhu
|
(Guangxi Electric Power Industry Investigation Design and Research Institute, 10 Jianzhenglu. Nanning, Guangxi, 530023) |
Abstract: |
The technic of combining energy dissipation by means of flaring gate piers is a simple and effective measure for transition from two dimensional energy dissipation into three-dimensional one.Through the application and practice on Yantan project the profitability and engineering economics can be proved. |
Key words: hydro-power station bucket basin flaring gate pier effecfiveness of combining dissipation flow condition |